Give Us A Call:
Questions?

Full Bathroom Remodel In Spring TX By EZ Bath

Before
After
Full Bathroom Remodel In Spring TX By EZ Bath

Description Of The Remodeling Project

Tub To Shower Conversion

Replaced their old tub and installed a large shower that you can walk into.  This shower was completed with all tile work.  Next to the new shower which was their old shower, we turned into a large linen cabinet by Bishop.  We were able to cap off the area and finish it out with the new cabinet.  Came out great!

Location
Designer
Days To Complete
9
Shower Wall Material
Shower Base Material
BCI Wall Color
Onyx  Wall Color
Onyx Shower Base Color